Advent Health Cath Lab Renovations – Tarpon Springs

Complete de-install of GE Mavic operating equipment, new ceiling grid system incorporating cleanroom tiles, and upgrading of the electrical outlets. We installed a new surface mounted wall duct for GE to run the new equipment cables and wires, uplift bracing for the sprinkler system. New space created for storage of tools and documentation for the system. Maintained ICRA plan with Edge Guard panels and negative air monitoring. GE then installed new Mavic 2 equipment along with all new paint throughout the space. ICRA/AHCA regulated project.

Architect: Chapuls Design Group