Albert Whitted Airport Southwest Hangar Redevelopment

The redevelopment consisted of constructing/installing aircraft tie-down aprons; replacing two (2) existing T-Hangars (Nos. 7 and 8) with two (2) new T-Hangars, and constructing two (2) new Shade Hangars (Nos. 15 and 16).

This project used no less than 20% recycled materials including steel and concrete. All metal and concrete were purchased within a 500-mile radius from Albert Whitted Airport, and a minimum of 75% of all materials during demolition was recycled or salvaged.